





Construction & Site Management
Pre-Construction Planning
Before breaking ground, we finalize all preparations:
- Construction Certificate: Obtaining approval to commence building.
- Site Setup: Establishing safety measures, erosion controls, and temporary services.
- Trade Scheduling: Coordinating qualified tradespeople to ensure efficient workflow.
Construction Phases
Our construction process is methodically structured:
- Site Works: Clearing, excavation, and foundation preparation.
- Slab and Framing: Pouring the concrete slab and erecting the structural frame.
- Enclosure: Installing roofing, windows, and external cladding.
- Services Installation: Plumbing, electrical, and HVAC systems.
- Internal Fit-Out: Insulation, plastering, cabinetry, and fixtures.
- Finishing Touches: Painting, flooring, and final detailing.
Quality Assurance
We implement rigorous quality control measures:
- Regular Inspections: Conducted at key milestones to ensure workmanship and compliance.
- Defect Management: Prompt identification and rectification of any issues.
- Client Updates: Providing progress reports and site photos to keep you informed.
Safety and Compliance
Safety is paramount on our sites:
- Work Health and Safety (WHS): Adhering to NSW WHS regulations to protect workers and visitors.
- HazardCo System: Utilizing comprehensive safety management tools for risk assessments and incident reporting.
- Licensed Trades: Engaging only certified professionals to maintain high standards.